5Order
Trade account order · Porch and front wall, Batley

AR-41206

Sent to Xero
Kilner Construction, builder, trade account at Band C. Placed on the Kilner Construction trade account by Lauren Burton on Thu 1 Oct at 12:57 (their ref PO 4905). Own hiab for Fri 9 Oct to Porch and front wall, Batley. Owner Josh Kenyon.
Total, inc VAT
£2,046.20
£1,705.17 ex VAT + £341.03 VAT
Margin
47.3%
floor 12% a line
Kilner Construction
Lines at Kilner Construction’s own prices
Prices ex VAT: contract price first, then Band C; never under cost plus 12%
ex VAT
ProductQtyEachLineFrom
Common brick, blend, 65mm
RPB-CB65-250 · Pack of 250 bricks
3 packs
750 bricks
£342.79
Band C
£1,028.37
RL-0336 · 3 packs
Tumbled stacker paver, per paver
PAV-TSTK-EA · Per paver
940 pavers£0.72
Band C
£676.80
RL-0375 · 940 pavers
Net, ex VAT£1,705.17
VAT at 20%£341.03
Total£2,046.20
6 pallets on the hiab. Every line clears the 12% margin floor.
Where each pack comes from
The lots it left the yard from, oldest stock first
Yard map →
3 packs, 750 bricks of Common brick, blend, 65mm
RL-0336 Steelworks offices, Bradford · Kirkstall Strip-Out · in stock 13 Apr
Left9 Oct
940 pavers of Tumbled stacker paver
RL-0375 Engine shed, Mexborough · Own salvage team · in stock 21 Oct
Left9 Oct
Checked as it landed
price, stock and credit, before anyone touched it
£price
Priced at their rate
2 at Band C. Every line clears the 12% margin floor.
▦stock
Stock kept
Every line was available and kept for this order as it was read.
✓credit
Within the limit
Passed when it landed: inside the £6,000 limit.
As it arrived
Placed on a trade account; priced at the account’s band and invoiced on its terms
Trade account order1 Oct 12:57
Lauren Burton, Kilner ConstructionTheir ref PO 4905
ItemQtyTheir price
Common brick, blend, 65mm, pack of 2503£342.79
Tumbled stacker paver, per paver940£0.72
Placed on the Kilner Construction trade account; priced at Band C and invoiced on 30 days end of month.
What they placed
  1. Common brick, blend, 65mm, pack of 250 x 33 x RPB-CB65-250
  2. Tumbled stacker paver, per paver x 940940 x PAV-TSTK-EA
Placed from their own price list; nothing typed twice.
Delivery
HI
Own hiab
Hiab 2, brick grab, YK19 HBG, Mick
DeliverFri 9 Oct
ToPorch and front wall, Batley, WF17
Load6 pallets
RunWakefield and Calderdale, drop 4 of 4
Signed forL. Burton at 10:41, photo taken
Slot bookedFirst drop
Booked by phone with Lauren by Josh, on 2 Oct 14:42.
INV-52921Sent to Xeronot due yet
Dated9 Oct 2026
Due30 Nov 2026 (30 days end of month)
Total£2,046.20 inc VAT
Sent to Xero at 18:00 on 9 Oct from the delivered quantities. Nothing re-typed; Xero stays the ledger.
Customer
KC
Kilner Construction
T-1045 · Builder · Batley
ContactLauren Burton, site manager
Phone0113 496 0408
PricesBand C, 5% off list
Terms30 days end of month
Credit£2,046 of £6,000
Usually byEmail
Short stockring first
Timeline
Lauren placed it on the Kilner Construction trade account (PO 4905)
Customer · 1 Oct 12:57
Priced at the Kilner Construction account rates: 2 at Band C
Auto · 1 Oct 12:58
Stock kept for this order; the three stores show the new count
Auto · 1 Oct 12:58
Credit checked: within the £6,000 limit
Auto · 1 Oct 12:58
Slot booked with Lauren: Fri 9 Oct, first drop on the Wakefield and Calderdale run
Josh · 2 Oct 14:42
Picked by Kyle from RL-0336 and RL-0375, checked by Gary
Yard · 8 Oct 13:40
Loaded on Hiab 2, brick grab (YK19 HBG)
Mick · 9 Oct 07:00
Delivered, signed for by L. Burton. Photo on the driver’s phone
Mick · 9 Oct 10:41
Invoice INV-52921 sent to Xero from the delivered quantities. Nothing re-typed
Auto · 9 Oct 18:00