5Order
WhatsApp order · Garage and boundary wall, Goole

AR-41391

Sent to Xero
Tingle Construction, builder, trade account at Band C. WhatsApp from Rob Chapman to 07700 900000 on Tue 13 Oct at 19:01. Own hiab for Tue 20 Oct to Garage and boundary wall, Goole. Owner Ellie Marsden.
Total, inc VAT
£2,412.98
£2,010.82 ex VAT + £402.16 VAT
Margin
29.2%
floor 12% a line
Tingle Construction
Lines at Tingle Construction’s own prices
Prices ex VAT: contract price first, then Band C; never under cost plus 12%
ex VAT
ProductQtyEachLineFrom
Engineering brick, solid red, 65mm
NEB-RED65-380 · Pack of 380 bricks
2 packs
760 bricks
£349.91
Band C
£699.82
PO-3105 · 2 packs
Engineering brick, red, 75mm
NEB-R75-424 · Pack of 424 bricks
3 packs
1,272 bricks
£437.00
Band C
£1,311.00
PO-3112 · 3 packs
Net, ex VAT£2,010.82
VAT at 20%£402.16
Total£2,412.98
5 pallets on the hiab. Every line clears the 12% margin floor.
Where each pack comes from
The lots it left the yard from, oldest stock first
Yard map →
2 packs, 760 bricks of Engineering brick, solid red, 65mm
PO-3105 New, from Hollin Brickworks · delivered 25 Sep
Left20 Oct
3 packs, 1,272 bricks of Engineering brick, red, 75mm
PO-3112 New, from Northern Clay Distribution · delivered 5 Nov
Left20 Oct
Checked as it landed
price, stock and credit, before anyone touched it
£price
Priced at their rate
2 at Band C. Every line clears the 12% margin floor.
▦stock
Stock kept
Every line was available and kept for this order as it was read.
✓credit
Within the limit
Passed when it landed: inside the £6,500 limit.
As it arrived
Sent to the WhatsApp line; turned into an order by the customer experience team
How it was read
  1. 2 x engineering brick, solid red, 65mm2 x NEB-RED65-380
  2. 3 x engineering brick, red, 75mm3 x NEB-R75-424
Read in 24 s; lines under 90% sure wait for a person.
Delivery
HI
Own hiab
Hiab 2, brick grab, YK19 HBG, Mick
DeliverTue 20 Oct
ToGarage and boundary wall, Goole, DN14
Load5 pallets
RunHull and East Riding, drop 1 of 5
Signed forR. Chapman at 07:48, photo taken
Slot bookedAM, 7:30 to 12:00
Booked by phone with Rob by Ellie, on 14 Oct 11:43.
INV-53077Sent to Xeronot due yet
Dated20 Oct 2026
Due30 Nov 2026 (30 days end of month)
Total£2,412.98 inc VAT
Sent to Xero at 18:00 on 20 Oct from the delivered quantities. Nothing re-typed; Xero stays the ledger.
Customer
TC
Tingle Construction
T-1094 · Builder · Goole
ContactRob Chapman, contracts manager
Phone01632 960751
PricesBand C, 5% off list
Terms30 days end of month
Credit£4,511 of £6,500
Usually byTrade account
Short stockpart-ship and back-order
Timeline
WhatsApp from Rob to 07700 900000
Customer · 13 Oct 19:01
Read in 24 s: 2 of 2 lines matched to products
Auto · 13 Oct 19:02
Priced at the Tingle Construction account rates: 2 at Band C
Auto · 13 Oct 19:02
Stock kept for this order; the three stores show the new count
Auto · 13 Oct 19:02
Credit checked: within the £6,500 limit
Auto · 13 Oct 19:02
Slot booked with Rob: Tue 20 Oct, AM, 7:30 to 12:00 on the Hull and East Riding run
Ellie · 14 Oct 11:43
Picked by Dean from PO-3105 and PO-3112, checked by Gary
Yard · 19 Oct 13:40
Loaded on Hiab 2, brick grab (YK19 HBG)
Mick · 20 Oct 07:00
Delivered, signed for by R. Chapman. Photo on the driver’s phone
Mick · 20 Oct 07:48
Invoice INV-53077 sent to Xero from the delivered quantities. Nothing re-typed
Auto · 20 Oct 18:00