5Order
Phone order · Raised beds, Skipton

AR-41727

BookedOld price stopped
Calder Landscaping, landscaper, trade account at Band B. Phoned in by Simon Hunt on Wed 4 Nov at 12:06; keyed once by Josh during the 3 minute call. Own hiab for Wed 18 Nov to Raised beds, Skipton. Owner Josh Kenyon.
Total, inc VAT
£7,240.13
£6,033.44 ex VAT + £1,206.69 VAT
Margin
39.6%
floor 12% a line
Calder Landscaping
About this order
Keyed at last year’s price from memory. The margin floor stopped it and priced it at the account’s band.
Lines at Calder Landscaping’s own prices
Prices ex VAT: contract price first, then Band B; never under cost plus 12%
ex VAT
ProductQtyEachLineFrom
30 sqm£150.26
Band B
£4,507.80
S1-1RL-0378 · 30 sqm
Handmade clay paver
PAV-HMC-400 · Pack of 400 pavers
1 pack
400 pavers
£509.06
Band B
£509.06
E1RL-0376 · 1 pack
Engineering brick, solid red, 65mm
NEB-RED65-380 · Pack of 380 bricks
Carried £256.00, under the £273.91 cost: stopped by the margin floor
3 packs
1,140 bricks
£338.86
Band B
was £256.00
£1,016.58
+£248.58 kept
D4PO-3105 · 3 packs
Net, ex VAT£6,033.44
VAT at 20%£1,206.69
Total£7,240.13
7 pallets on the hiab. Every line clears the 12% margin floor.
Where each pack comes from
The bay and the lot kept for it, oldest stock first
Yard map →
30 sqm of Yorkstone paving, cathedral grade
RL-0378 Pumping station, Castleford · Kirkby Brook Demolition · in stock 13 Oct
BayS1-1
1 pack, 400 pavers of Handmade clay paver
RL-0376 Farm buildings, Wirksworth · Thornbeck Demolition · in stock 2 Nov
BayE1
3 packs, 1,140 bricks of Engineering brick, solid red, 65mm
PO-3105 New, from Hollin Brickworks · delivered 25 Sep
BayD4
Checked as it landed
price, stock and credit, before anyone touched it
£price
Old price stopped
One line carried a price under the margin floor and was priced at the account’s rate instead. 3 at Band B.
▦stock
Stock kept
Every line was available and kept for this order as it was keyed.
✓credit
Within the limit
£7,240 of the £18,000 limit in use with this order.
As it arrived
Keyed once while the customer is on the line; card taken or put on account
Incoming call4 Nov 12:06
Simon Hunt, 0113 496 0492answered by Josh Kenyon
3 minute call. Keyed once while Simon was on the line; each line priced and checked for stock as it was typed.
  • 30Yorkstone paving, cathedral grade, per sqm
  • 1Handmade clay paver, pack of 400
  • 3Engineering brick, solid red, 65mm, pack of 380
How it was keyed
  1. 30 x Yorkstone paving, cathedral grade, per sqm30 x FLG-CATH-SQM
  2. 1 x Handmade clay paver, pack of 4001 x PAV-HMC-400
  3. 3 x Engineering brick, solid red, 65mm, pack of 3803 x NEB-RED65-380
Keyed once while Simon was on the line; nothing typed twice.
Delivery
HI
Own hiab
Hiab 4, brick grab, YK70 BRC, Dave
DeliverWed 18 Nov
ToRaised beds, Skipton, BD23
Load7 pallets
RunAiredale and Wharfedale
Slot bookedAM, 7:30 to 12:00
Agreed on the order call with Simon, keyed by Josh.
Not yet. Once it is signed for, the invoice is made from the delivered quantities and sent to Xero at 18:00 that evening, on 30 days end of month.
Customer
CL
Calder Landscaping
T-1057 · Landscaper · Skipton
ContactSimon Hunt, director
Phone0113 496 0492
PricesBand B, 8% off list
Terms30 days end of month
Credit£7,240 of £18,000
Usually byPhone
Short stockpart-ship and back-order
Timeline
Simon phoned the order in; Josh keyed it once (3 min call)
Josh · 4 Nov 12:06
Priced at the Calder Landscaping account rates: 3 at Band B
Auto · 4 Nov 12:07
Margin floor stopped Engineering brick, solid red, 65mm, pack of 380 at £256.00 (cost £273.91, floor £311.27); priced at £338.86, £248.58 kept
Auto · 4 Nov 12:07
Stock kept for this order: 30 sqm from S1-1 (RL-0378); 1 packs from E1 (RL-0376); the three stores show the new count
Auto · 4 Nov 12:07
Credit checked: within the £18,000 limit
Auto · 4 Nov 12:07
Slot booked with Simon: Wed 18 Nov, AM, 7:30 to 12:00 on the Airedale and Wharfedale run
Josh · 4 Nov 12:09
Next: picked by bay, then out on Hiab 4, brick grab at 07:00 Wed 18 Nov
Planned · Tue 17 Nov 13:00